CT Saw

Job Summary

Operator accurately cuts PVC (plastic) pipe into segments within a + – 1/4″ accuracy.

Reports to: Leadperson

Responsibilities

  • Operator accurately cuts PVC (plastic) pipe into segments within a +- 1/4″ accuracy
    • Clean pipe prior to cutting.
    • Transfer pipe on to rack.
    • Setup machine using established procedures.
    • Set up stop bar for correct length and safely cut pipe into segments.
    • Communicate any problems found with the machine or PVC parts used to leadperson.
    • Accurately record the completed work on the production sheet.
    • When warranted, create a “work tag” and attach to the product completed.
    • Clean up work area as needed and at the end of the shift (10-15 minutes max).
  • Follow Safe Operating Procedures and General Safey Rules.
  • Other duties assigned by management.

Essential Function

  • Standing for long periods of time
  • Lifting up to 50lbs, occasionally more.
  • Able to read, understand, and follow instructions, warning labels and postings.
  • Bending and stooping – at the waist and at the knee.
  • Must be able to measure within 1/8″.
  • Must be able to count.
  • Must be able to walk to various other stations within the department with product or various weights.
  • Must be able to use electric and air tools.